|
B Shift |
September 7, 2001 |
1900 hours |
| Riverside
Park
815 Labaree Street |
| Engine Co.
1, Engine Co. 2, Ladder Co. 3, Squad 6, Rescue Co. 1, Car 1 |
|
 |
| Scene
shortly after arrival. Firefighters from Engine Co. 2 stretch attack
line. |
|
 |
|
Firefighters from Engine Co. 2 and Rescue Co.1 have forced entry.
Attack Team prepares to enter as Rapid Intervention Team gets ready. Incident
Commander observes progress. |
|
 |
| Incident
Commander and Safety Officer observing initial Attack Team and Rapid
Intervention Team beginning operations. |
|
 |
| Ladder Co.
3 arrives on scene assigned to vent the roof. |
|
 |
| Aerial of
Ladder Co. 3 is positioned to roof. Firefighters from Engine Co. 1 and
Squad Co. 6 have raised a 24 foot extension ladder and are preparing to open
the wall above the one story portion at left. |
|
 |
|
Firefighters from Ladder Co. 3 get instructions before going to the roof to
vent. |
|
 |
|
Firefighters from Ladder Co 3 going
to roof. Firefighters from Engine Co. 2 and Squad Co. 6 continuing
attack. Rapid Intervention Team stands by at left. |
|
 |
|
Firefighters from Ladder Co. 3
venting roof. |
|
 |
|
Firefighter from Squad Co. 6 opening
wall to check for fire extension. Fire Operations Officer observes progress
at right. Rapid Intervention Team stands by at left. |
|
 |
|
Firefighters from Engine Co. 1 advance hose line up extension ladder to firefighters from Squad Co. 6 who have found fire extension in wall over
single story portion at left. Other Firefighters from Squad Co. 6 open
wall from an extension ladder at center. Incident Commander and Safety
Officer observe progress. |
|
All Photos taken by Steve Jones |