Street Work Updates

 

2021 Reconstruction

Street

From

To

Length (mi)

S Third Street

River Dr

Mary St

.39

Hart Street

Dakota St

S. Third St

.07

William Street

Dakota St

Wakoka St

.16

   2021 Resurfacing    
Street

From

To

Length (mi)

Air Park Drive S. Church St

900' E of Gateway

.42

2021 Crack Sealing and Seal Coating

Street

From

To

Length (mi)

Mary Knoll Lane


200' N of Country La

Carriage Hill Dr

.27

Harvey Avenue

Western Ave

Thomas Ave

.12

East Gate Drive

City Limits

Summit Ave

.53

S. Twelfth Street

Hart St

Clark St

.33

S. Twelfth Street

Clark St

Boomer St

.27

South Street

Milford St

500' W of Winnebago Way

.31

Randolph Street

Hart St

Termini

.60

Carol Street

Randolph St

S. Tenth St

.06

Reinhold Street

Randolph St

S. Tenth St

.06

William Street

Randolph St

S. Tenth St

.06

Hart Street

Randolph St

S. Twelfth St

.19

N. Water Street

STH 16

Silver Creek Rd

.72

Clark Street S. Third St Utah St .32
  2021 Crack Seal

   
Summit Ave (STH 19)

E Main St

White Edgeline

.40

Summit Ave (STH 19)

White Edgeline

300' E of East Gate Dr .18
Octagon Court

Richards Ave

Termini

.05

 

 

The following are updates on current street work in the City of Watertown: